WHAT'S NEW
 

BELLEVILLE, NJ – BELLEVILLE MUNICIPAL HIGH SCHOOL BALL FIELD –
(December, 2009)

HYBRID/GREEN PROJECT

The job was awarded to Dakota Excavating, Inc. Lightweight aggregate (Solite®) provided by Northeast Solite Corporation. Approximately 8,000 tons of lightwieght was used as a drainage layer for the new high school ball field.

 
 

NORTHEAST SOLITE CORPORATION
HELPING TO EXPAND THE HEALTHCARE COMMUNITY.

Solite® is specified in hospitals by architects, engineers and design/builders due to its flexibility in meeting enhanced fire rated floor and wall assemblies. These projects are current examples that are under construction now for completion in the Fall of 2009 that incorporate UL® three and four hour fire rated systems in their construction.

In addition, reduced dead loads require smaller columns and longer spans between columns are realized.

These factors increase useable space, reduce initial and operational costs, and lower fire insurance premiums.

Virtua Hospital, Vorhees NJ

Project Mgmt Firm: Hammes Company
Architectural Firm: Hammel, Green & Abrahamson (HGA)
Construction Firm: Turner Construction
Concrete Contractor: E Perini
Ready Mix Supplier: R E Pierson, Mt Holly, NJ, Tony Dewinters

Remarks: Concrete was placed all winter in sub freezing temps without a problem. Some was pumped up to 400 ft vertically.

Doylestown Hospital - Emergency Department – (August 2008)

Concrete subcontractor: Louis Dolente and Sons
Ready Mix Supplier: Delaware Valley Concrete, Hatboro PA: Michael McCarthy

Remarks:
Approximately 3,000 cu yds of LWA Concrete was placed by pump to elevated slabs

 
 

HPC Bridge Gets Internal Curing

TWAALFSKILL BRIDGE – (August 2008)

HYDROCURE® – Cures, even before finishing stops.

Phase I of a 2 year project on NYS Route 9W requires the construction of a new, wider more sustainable structure to accommodate higher vehicular traffic. Phase I addresses the southbound lane. Phase II commencing in the spring of 2009 will address the northbound lane.
HydroCure® was selected based on its ability to minimize cracking in the High Performance Concrete (HPC) deck. Its use improves on all the characteristics of concrete. This is accomplished by substituting a small amount Hydrocure for some of the natural sand in a yard of concrete.

Click Here For More Information

 
 

UNIVERSITY OF MD PROJECT – (August 2008)

Main Line Commercial Pools

Installation of the Solite® was a combination of Main Line Commercial Pools and RK HydroVac, Ohio, providing the only truck that could complete the work. 550 yards or 475 tons of Solite® was used in this project.

 
 

TANNERSVILLE, NY – WATER TREATMENT FACILITY – (September 27, 2007)

MANUFACTURED WETLAND IN TANNERSVILLE

This is a manufactured wetland that utilizes Solite® lightweight aggregate to breakdown harmful compounds. The effluent passes through the aggregate that contains colonized bacteria that feed on the compounds. The native plants then complete the filtration process absorbing the converted material that is now a plant nutrient. The resulting effluent leaves the wetland via gravity in a purified state into the watershed. Click here For more information on Wetlands.

 
 
HydroCure® Project – (May 2007)

OHIO DEPARTMENT OF TRANSPORTATION CLEVELAND, OHIO

A short span interstate highway overpass bridge widened and redecked to accomodate higher vehicular gross load limits and to provide pedestrian access in an area of marked urban growth.

 
 

SAUGERTIES, NY – (July 27, 2007)

NORTHEAST SOLITE COPORATION CONTINUES TO GREEN!

Northeast Solite Corporation, loading its specialty aggregate, Solite® onto a barge at our dock on the Hudson River, at Glasco, New York. A few short miles from the Saugerties, New York quarry and center of operation. For delivery information in your area, please contact us.